Graphic explanation: cabinet installation process

There is a saying in the industry that 'cabinet is a three-point product and a seven-point installation'. It can be seen that for cabinets with customized products, installation is the final step and the most critical step in the consumption of cabinets. The installation of cabinets is not only directly related to the aesthetics of the cabinets, but also related to the daily use of the heart. Here we look at an example to see what needs the attention of the owners, so that the friends to be renovated reference.

The first step: preparation before installation

Designers first test the door, make the basic layout of the kitchen and the layout diagram of the water supply, and refer it to the construction team for reference.

The construction team made arrangements for water pipes and wires, stuck ceramic tiles on the walls and floors, and made ceilings in the kitchen.

The owners set up basic appliances such as strips, stoves, sinks, and microwave ovens, reported the sizes to the designers, and informed the manufacturers that the water heaters and water purification equipment were installed to ensure smooth flow of water, electricity, and coal. Designers come to retest, according to the actual size of this design, make cabinets.

Reminder: The person in charge of this stage should be a cabinet designer. He must design cabinets after understanding the overall layout of the kitchen and the styles and dimensions of all electrical appliances, and give professional advice on construction and electrical purchase so as to ensure The cabinets and appliances, and the kitchen are matched when installed. At the same time, in the whole process, the owner needs to know the progress of the project from time to time and coordinate the communication between the cabinet designer and the construction team.

The second step: on-site installation

Door panel processing, installation of hinges. The doors of most manufacturers are delivered in the finished product, and the hinges are also installed in a unified position. Cutting on the site is not required, and hinges can be installed by the workers.

Install the lower cabinet frame. The worker assembled the lower cabinet body frame at the scene, and then drilled and screwed it to the wall.

Install the lower door panel. After the frame is assembled, the door and the cabinet are connected by hinges, and the adjustment is fixed.

Install the countertop. After the upper and lower cabinets are installed, place the wells that have been well-opened on the top of the cabinet, and use a wooden support plate to reinforce the middle. Use a silicone seal at the connection between the table top and the wall surface.

Install the cabinet. Also fix the cabinet frame first and then install the door panel. Pay attention to the use of hanging yards to reinforce the cabinet and wall joints.

Adjustment, cleaning. After installation, the workers did a simple cleanup on the site.

Reminder: The cabinet designer's work is mainly concentrated on the pre-installation preparation period. At the site installation stage, it is the installation of the responsible person and the installation worker. However, because the designer knows more about the owner's kitchen and the cabinet products, in order to ensure the installation is correct, the designer should communicate with the installation worker well before installation to prevent the worker from installing it. If there is a problem, he still needs to find a designer to solve it. .

Installation follow-up matters owners own deployment is good

1. To open the gas, this will be done by the owner himself to the gas company.

2. Install strips, cookers, sinks, storage parts and so on. Generally, the manufacturer is responsible for the installation, but the installation of the Xiaojian's sink has encountered this problem: The installer asks the owner to provide the required glue and other tools, and all he does is put the sink on the countertop. This is certainly true. It is wrong. So these details must be determined with the business at the time of purchase.

3. Install the kitchen door.

Reminder: This step does not seem to have anything to do with the cabinets, but in fact many issues related to these follow-up issues are to be done in advance during the installation phase of the front cabinets, such as the specific location and size of the shove, cooker, and sink. When setting up the cabinets, it is necessary to set aside accuracy, or else there will be regrets that the side-suction type of Xiaobian is too low.

Recommended reading:

How do different groups buy cabinets?

Expose the four common types of cabinets

Do not know: choose the details of the cabinet

Perfect kitchen cabinet "10 look" and "10 questions"

Experience in the electrical room microwave home improvement cleaning company kitchen door cabinet cupboard door cabinet door kitchen cabinet door cabinet door door door door door tile adhesive kitchen tile

Flexible Led Strip

Flexible LED strips are assembled using FPCB and assembled with patch LEDs. Because the FPC material is soft, it can be bent, folded, and wound freely. It can be moved and stretched and folded in three-dimensional space. It is suitable for irregular places and small spaces, and it can be bent and wound at will. It is suitable for arbitrarily combining various patterns in decorations such as advertisements. It is DC 5-24V power supply, low power consumption, silicone potting, bright color, uniform color mixing, not easy to damage, beautiful appearance, safe and reliable, easy to install

Flexible LED Strip,S Shape LED Strip,5050Smd Flex LED ,Flex LED Strip

SHEN ZHEN SEL LIGHTING CO.,LTD , https://www.sel-lighting.com