Recognized three rough closed housing know how much

Many owners are now paying more and more attention to the decoration, but they do not know that many problems in decoration are accumulated during your "love room" or rough time. The so-called childhood is malnutrition and grows up. That's more. So today, let Xiao Qi take you to look at the rough room that has just arrived at the inspection room. The first pass: Doors and windows acceptance windows and doors are the safety “flood gates” in the home. Many owners will replace doors and windows during the renovation. However, in the construction process, materials are moved in and out, it is easy to scratch the door panels, and before the renovation, it is necessary to receive work. , And the decoration company said clearly, so as to prevent the renovation company shirk responsibility. For the acceptance of the windows, we must pay attention to whether the glass is scratched, whether the sealing strip is complete, and whether the pulley is still intact. And whether the relevant hardware accessories are complete, if the windows need to be replaced, but also carefully check the materials and accessories. The second pass: The wall surface inspection of the wall surface is the easiest link to solve various problems, although some of them can be solved through post-decoration, but this will definitely affect the decoration effect in the later period. First of all, if you find cracks in the area where the wall and the beam are parallel, don't worry too much. Generally, there is no danger. When the decoration is done, the cement worker will repair it. However, if the crack is at a 45-degree angle to the corner or perpendicular to the beam, it means that The settlement of the house is serious. At this time, you have to inform the property to deal with it. And if you find that there are cracks on the sides of the balcony, it is a very serious phenomenon, or there is a crack in the load-bearing wall, then you have to quickly notify the property to coordinate the construction side to deal with. Take a small hammer and tap on the wall to check if there is an empty drum. The hollow area should not exceed 200 square meters. If the wall has been remodeled during the renovation, we must also pay attention to the emptying phenomenon. If it is severe, we should request immediate rework. There is also to remember that you must use a tape measure to measure the height of the floor, measuring a few more places, the height of the building 2.8 meters, shall not be less than 2.6 meters, and the height of 3 meters, shall not be less than 2.75 meters. However, if you feel that the younger partner is slightly lower in height, you can improve it with a few tricks in the decoration. However, if you find that the height of the floor is shrinking, you must find the property builder's theory. The flatness of the ground and the verticality of the wall can be measured by a plumb line and a wedge feeler. The flatness and perpendicularity of the yin and yang angle should be less than 4mm. In addition, the flatness of the ground is generally satisfactory. If the decoration is finished, the construction party says The ground is to be re-leveled, and most of it is not credible. Acceptance of exterior walls is a relatively easy part to ignore. After the rain has passed, it can be observed whether there is any leak in the outer wall or window frame. The joints must be densely packed. If there are any problems, they should be reported to the developer as soon as possible. The third level: The acceptance of developers of hydropower coal during construction is only a preliminary arrangement on the road. However, it must be re-edited during the renovation. If the developer's layout is unreasonable or there is a problem, it will bring about the subsequent construction. Big trouble. Check whether the weak electricity system (wireline, network, telephone) lines are smooth. When the circuit is reformed, it should be noted that the vertical distance between strong and weak electricity should be kept beyond 1m, and the distance cannot reach the requirements, which will affect the television viewing effect. Check whether the switches in the distribution box have quality problems. If there are looseness, tighten them or replace them in time. If the distribution box moves, it is necessary to remind the electrician to correctly identify each switch in the renovation so that the family can use it safely.

Water and electricity acceptance clay project acceptance woodwork acceptance

1 Lock body made of brass, durable, lightweight, cylinder can be copper or iron, copper and iron key can.

2 Shackle made of iron chrome, nickel, or spraying. In addition, it can also make stainless steel or copper hook hook. Shackle can be extended according to customer needs to 40MM 60MM 90MM.

3 Lock body surface may print the company name, pattern, number, print mode is molded or laser
4 The lock cylinder according to customer's needs, to make keyed different, flush keys, key executives
Scope:
Our products are widely used in electricity, engineering industries lockout / tagout, gas pipeline, meter boxes, metering boxes, factories, property, mines and so on.

M-THICK BRASS PADLOCK-SAND POLISH-400M-THICK BRASS PADLOCK-SUPER POLISH-400

Medium Type Brass Padlock

Medium Type Brass Padlock,Solid Brass Padlock,Medium Duty Brass Padlock,Medium Thick Brass Padlock

Shengping Safety Protection Locks Manufacturer , https://www.chinajiuzhou.com