Design and Application of Power Management System in Suzhou Wuhu Neighborhood Center

Introduce the power management system of Suzhou Wuhu Neighbourhood Center, and use intelligent power meters to collect various electrical parameters and switching signals from the power distribution site. The system adopts the on-site local networking mode. After networking, it communicates through the field bus and travels to the background. Through the Acrel-3000 power management system, the real-time monitoring and power management of the power distribution circuit of the substation is realized.
Yang Junjun 1

1 Ankerui Electric Co., Ltd., Jiading, Shanghai 201801, China;



0 Overview

The Penghu Neighbourhood Center is the first neighborhood center project in Xiangcheng District and the third project of the accidental investment development of the Neighborhood Center Company in Suzhou Industrial Park. The design team of the Neighbourhood Center provides the project design task independently. The project covers an area of ​​2 hectares with a construction area of ​​25,000 square meters and a total investment of about 120 million yuan. It is planned to be put into operation in June 2014. The project will adhere to the consistent service concept of the neighboring center company, equipped with community basic service functions such as supermarket, banking, communication, catering, beauty salon, pharmacy, maintenance, cultural and sports center. At the same time, the Neighbourhood Center Company will continue to optimize the business settings and merchant mix in combination with the leisure and consumption habits and needs of the working and living groups in the Suxiang Cooperation Zone, so that the project will be more “localized” and “humanized” and better served. In the Suxiang Cooperation Zone, the soft environment for attracting investment in the cooperation zone will be enhanced to promote the commercial development of the cooperation zone.

This project is the energy management system of Suzhou Wuhu Neighborhood Center. According to the requirements of power distribution system management, it is necessary to conduct power monitoring and power management on the floors and distribution lines of the Suzhou Wuhu Neighborhood Center to ensure safe, reliable and efficient use of electricity.

The Acrel-3000 low-voltage intelligent power distribution system makes full use of the latest developments in modern electronic technology, computer technology, network technology and fieldbus technology, and performs distributed data collection and centralized monitoring and management of the power distribution system. The secondary equipment of the power distribution system is networked, and the field devices of the distributed power distribution stations are connected as an organic whole through the computer and the communication network to realize remote monitoring and centralized management of the power grid operation. Hardware Business Network Information Center)http://news.chinawj.com.cn

1. Use Surface Mount System to install electron component. High quality stable and more quality consistency.

2. Pass germany TUV testing, have EMC and LVD certificate.

3. The AC input power voltage is made between 85V to 240V. So it could select AC input voltage automatically. You could work in AC USA 110V or AC europe 220-240V.

4. CEL: Cellulose electrode is special electrode to lay big pipe on oil and chemical industry, natural gas, electric power, civil pipeline of oil, gas, water. They need high ilder voltage (more than 90V). This machine could do

Inverter DC MMA Welder

Welding Machines, Welding Equipment, MMA Welding, Miller Welders

YongKang WALMA Tools CO., LTD. , http://www.walmatools.com