Steps, time, tools, and precautions in waterway reconstruction

Preparations: First of all, say hello to the property, whether the water shut-off test passed the acceptance, whether it can be started, do not need to do a start card, otherwise the decoration pressure is more dangerous! !

1, self or let the designer design the shower, basin, bath, mop pool, wash basin and other outlet location. (There are not many kitchen modifications, there is a water outlet for the vegetable sink, and some need to add a water purifier) ​​I suggest you can install a small kitchen treasure or instant-type water heater, mainly used for washing vegetables, etc., convenient, out of hot water Also fast.

2. If your home is equipped with a gas-fired water heater (and a shared toilet) and the toilet is close to the kitchen, divert water from the kitchen to the bathroom (so that the pipeline may be used more, and in winter, the hot water must be used first. Cold water), but it is more convenient to use. If you want to solve the above problem, it is to install an electric water heater in the bathroom, but if the bathroom is small, it is too crowded and not beautiful. In this way, you have an option to install an instant-type electric water heater under the toilet bowl for washing, which is more convenient to use, and you can use the hot water of the gas water heater when bathing. However, the specific choice is whether the owner decides according to his own preferences.

3. The construction specification of “PP-R” water reform is “walking without going, not walking”. Because the planer property is not allowed, the planing site will destroy the waterproofing, and once it leaks, it will not be easy to find because the water is flowing down. The water leaking place does not have to flow out first, only when the water leaks to the building. The water leakage will only be discovered if it is under water, but because it is a dark pipe, it will not be able to find the leaking place immediately. Therefore, the loss will be quite large. If it goes to the top, the kitchen and bathroom can be covered with aluminum buckle ceilings, and the wall will be covered. At the entrance, we walk along the corner and can be covered with plaster lines without affecting the appearance. When the water pipe leads to the bathroom and meets the place where you need water, we will open the vertical slot down to the right height and reserve the water outlet for you. The advantage of this is that once the water leak occurs, the water Flowing low, you can find leaks immediately for easy maintenance.

4. When you communicate with our constructors, you will begin construction after the water is changed. First draw a line of ink to outline the route you need to take the tube (you can see from the road map that it is horizontal and vertical, this time if you have different opinions or changes, you can also discuss with the worker's master). These preparatory work is about an hour or so.

5, after playing a good line is to open a dark slot, with a special tool cutting machine cut the groove surface by line, and then use electric hammer slot. This time takes about 3-4 hours, another need to remind is that some residential areas are more thick and thick steel bearing walls, can not cut off the steel (affect the quality of the housing), can only open shallow (Twill be thickened (Cement) or take a light pipe, or go around other walls.

6, after the completion of the tank, is to install the pipeline, where the technology is hot melt, that is to say with the hot melt machine to join the pipe joint part through the hot melt into one, this is the "PPR" pipe and other pipe construction of the biggest difference, Aluminium-plastic pipes, galvanized pipes, and other joints are threaded or ferrule-type. When the lead pipe goes to the top, because it is a bright pipe, it will be fixed with a pipe clamp. The water pipe in the tank will be fastened with quick-drying powder, which will be more reliable so as to facilitate the next process. This process takes about 3 or 4 hours.

7, reserved outlet, if your home toilet, bathtub and other specifications are more special. Then you must explain clearly to our workers, because we are building by convention. Some owners may consider adding water to some items in the later period when they change their water. Then we will reserve 1, 2 outlets according to your requirements.

8, the completion of the construction, the most important step is acceptance, that is, through the pressure test. "PP-R" uses a pressure machine and hits a pressure of 8 kilograms. After 30 minutes, if there are no problems, the water reform will be completed successfully.
9. After the acceptance of the owners, our "PPR" water reform is based on the actual number of meters to be taken to collect the money. The water meter charges 50 yuan/piece, and the bearing wall punches 50 yuan each. Non-bearing wall 30 yuan.
10. After the construction is completed, the master of our workers will draw a draft of a waterway reconstruction plan. After returning to the company, we will use a computer to draw a map. Within about 7 days, we will send this map to your hands. The waterway map must be kept well, because some waterways sometimes encounter electric wires or other unavoidable ones. Therefore, depending on the water outlet, it may sometimes be a problem to determine the direction of the water pipe after entering the wall. Therefore, the waterway map must be kept for later use.

Water heater brand Haier water heater decoration design gas water heater electric water heater toilet water purifier kitchen bathroom ceiling bathroom waterproof bathroom ceiling bathroom leaky bathroom design

Non-locking Mast

Non-Locking Mast ,Antenna Push Up Pole,40 Ft Telescoping Pole,Portable Telescopic Mast

TIANHEMAST , https://www.robomasts.com