Wall-mounted urinal installation problem full answer

Urinals are mostly used in public buildings, and some homes now have urinals in their bathrooms. It is not difficult to install the urinal. Let's take a look at the installation steps of the wall-mounted urinal today!

installation steps

Place the urinal in the installation position and use the level gauge to correct the horizontal position to determine the installation height.

1 Mounting height refers to the height from the upper surface of the front edge of the urinal to the ground.

2 Installation height is recommended between 500-600mm.

Note: Due to the heavy weight of the product, it is recommended to install it by two people.

Mark the wall with a pen through the edge of the urinal and the mounting holes.

Remove the urinal, measure the mounting position of the hook on the wall through the mounting hole position, and make a mark on the wall.

Install hooks and horse heads.

1 Drill six 8mm holes in the wall hook hole mark, and insert the expansion rubber particles, and fix the hook to the wall with screws.

2 Place the horse's head on the reserved thread on the wall and tighten it, then insert the screw.

Place the rubber seal on the drain of the urinal.

Align the urinal with the horse head and the hook, mount it on the wall, and pass the two screws through the mounting holes of the urinal.

1 set the gasket, screw on the nut, and cover the decorative cap.

2 Instructions for installing the inlet and drain components purchased require the connection of the inlet and outlet valves.

Note: Do not screw the screws too tight, otherwise the product may be damaged.

Apply sealant to the edge of the urinal and wall contact surface.

Installation height

The hanging urinal is divided into two types: ground drainage and wall drainage. The installation of the ground drainage urinal is relatively simple. Generally speaking, there is no major problem. Only the height of the drainage outlet should be paid attention to; the urinal of the wall drainage should not only pay attention to The height of the drain, and it is best to reserve the inlet and outlet according to the size of the urinal to be installed before making the wall tile.

Hanging urinals usually require accessories such as screws, decorative caps, copper horse heads, aprons, urinal hooks, etc., which are indispensable. The installation height of the hanging urinal must be moderate. Generally, the height of the hanging urinal of the public toilet is about 750px, which is used by children. The installation height of the hanging urinal used by adults is generally around 1250px.

How many ways do you install urinals?

The installation method of the urinal is divided into two types: floor type and wall type. The floor type urinal is also called vertical urinal. The type of the urinal is large, the production is difficult, the materials are expensive, and the price is relatively expensive. Used to compare high-end public toilets. In order to prevent the urine from splashing out during use, products such as Toyo, Japan, increase the bottom pocket of the vertical urinal and improve its performance. Hanging urinals are mounted on the wall and have various shapes such as round, square, and streamlined. Compared with vertical urinals, these urinals save raw materials, reduce work space, save energy, and save money. Packing shipping costs are favorable, and it is not easy to splash urine, more sanitary, and there are many high-end luxury models available, so the direction of the hair has replaced the vertical urinal.

Expanded Ptfe Filler

Ptfe Filler Eptfe Filler,Spiral Wound Gasket,Eptfe Tape For Swg,Expandable Ptfe Filler Gaskets Tape

Cixi Congfeng Fluorine Plastic Co.,Ltd , https://www.cfptfeseal.com