After the scaffolding is put into use, the boarding staff should pay attention to the following issues:
1. On-shelf operators should walk up and down the stairs and are not allowed to climb shelves.
2. Workers on the shelves shall not loosen all the pull-ups and scaffolds of the scaffold, and all the parts of the fasteners such as fasteners. When certain rods must be dismantled due to the need of operation or when the wall is connected, the consent of the construction supervisor and technical personnel shall be obtained, and reliable remedial measures shall be taken.
3, shelf operators such as the discovery of shelf protection is not perfect, when the operation is not convenient to the construction responsible person or foreman to reflect, by shelf workers in a timely manner to add or improve before the shelves.
4. During the operation, attention should be paid to cleaning the materials falling on the rack at any time, and keep the racks clean and tidy. Do not put materials or tools in order to avoid affecting the safety of your own operations and causing injuries and injuries.
5, each time the work is completed, the material on the rack should be used up or placed in order to avoid accidental injury.
6. Strictly prohibit playing on the surface of the plane, walking backwards and sitting on the outer fence to rest, so as to avoid a fall accident due to body imbalance.
7. When conducting electrical welding work on the scaffold, it is necessary to lay iron or remove flammable materials and prepare for fire prevention to prevent fire.
8. After the rain and snow are put on shelves, the snow and water must be removed from the rack to avoid slippage.
9. When the height of the rack surface is not enough and the floor height needs to be raised, a stable and reliable method of raising the floor must be adopted. The height of the raised floor shall not exceed 0.5m. When the height is more than 0.5m, the raised floor shall be raised according to the erection regulations. When lifting the work surface, raise the protective facilities accordingly.
10. The use of scaffolding outside the project takes a long time. Therefore, during the course of use, inspections are also required. It is found that the foundation sinks, the deformation of the rods is severe, the protection is incomplete, and loosening and pull-up problems must be promptly resolved.
1. On-shelf operators should walk up and down the stairs and are not allowed to climb shelves.
2. Workers on the shelves shall not loosen all the pull-ups and scaffolds of the scaffold, and all the parts of the fasteners such as fasteners. When certain rods must be dismantled due to the need of operation or when the wall is connected, the consent of the construction supervisor and technical personnel shall be obtained, and reliable remedial measures shall be taken.
3, shelf operators such as the discovery of shelf protection is not perfect, when the operation is not convenient to the construction responsible person or foreman to reflect, by shelf workers in a timely manner to add or improve before the shelves.
4. During the operation, attention should be paid to cleaning the materials falling on the rack at any time, and keep the racks clean and tidy. Do not put materials or tools in order to avoid affecting the safety of your own operations and causing injuries and injuries.
5, each time the work is completed, the material on the rack should be used up or placed in order to avoid accidental injury.
6. Strictly prohibit playing on the surface of the plane, walking backwards and sitting on the outer fence to rest, so as to avoid a fall accident due to body imbalance.
7. When conducting electrical welding work on the scaffold, it is necessary to lay iron or remove flammable materials and prepare for fire prevention to prevent fire.
8. After the rain and snow are put on shelves, the snow and water must be removed from the rack to avoid slippage.
9. When the height of the rack surface is not enough and the floor height needs to be raised, a stable and reliable method of raising the floor must be adopted. The height of the raised floor shall not exceed 0.5m. When the height is more than 0.5m, the raised floor shall be raised according to the erection regulations. When lifting the work surface, raise the protective facilities accordingly.
10. The use of scaffolding outside the project takes a long time. Therefore, during the course of use, inspections are also required. It is found that the foundation sinks, the deformation of the rods is severe, the protection is incomplete, and loosening and pull-up problems must be promptly resolved.