Encounter Shida Dalian Trap User Readme Decoration Blood Tears History

We finally managed to buy a new home, happy to be ready to decorate it, so we went to major decoration markets to consult. After comparing a number of companies, we felt that a large foreign home market had both scale and formality and provided a stop. The service, and he and his family do indeed work too busy to deal with small decoration companies and guerrillas in the road, so initially decided to choose a large company to decorate their own home. Since making this decision, he has fallen into a chain trap that has already been set, and he has also fallen into endless troubles.


The following is my personal experience, and it is also the top ten traps of the large-scale home furnishing market that I summed up from the entire renovation process. I hope that people will not repeat my mistakes later, or they will fall into endless troubles. These are some help to everyone, and I'm happy.


The Biggest Trap: Promotion Traps


The second largest trap: the deposit trap


The Third Big Trap: The Budget Trap


The fourth largest trap: the contract trap


The fifth largest trap: commissioning trap


Sixth Big Trap: Purchase Traps


Seventh Trap: Project Traps


The eighth largest trap: traps


Ninth Trap: Clearing Trap


Tenth Trap: Complaint Trap


The Biggest Trap: Promotion Traps


When I entered this market, I was tempted to get tempting discount advertisements and smiley faces to promote the salesman, especially his moving advertisements, "the lowest labor cost is 6%," which had to be People are excited, so they are welcomed by the designers and give you the best promise of a big company. They also say that only the last two places are available, so let's quickly decide, otherwise there will be no chance. I just want to seize this “last chance” ”, quickly decided to sign a decoration with him, and got one of the last two decoration discount places. In fact, the "May Day" began this so-called "promotional activities." This was only the first trap they set up (promotion traps). I accidentally fell into the well-designed pitfalls.


The second largest trap: the deposit trap


Once you have signed this intention, you will not be able to look back because there are a series of traps waiting for you. So the designer told you that first pay 200 yuan for the measurement fee and 1,000 yuan deposit, (you pay attention to many large decoration companies are free to measure and design ah) This is their second well-designed trap (deposit trap) Because if you do not sign a decoration contract with them in the future, these measurement fees and deposits will not be returned to you. The eyes of our poor people are short-sighted. Who knows that for this 1,200 yuan, will there be more and more losses later? Only when you sign a renovation contract with him, the 1,000 yuan deposit can be returned to your decoration credit card (Note: This is what they call the convenience of the people. Actually it is just another trap of them. I will mention it later) The measurement fee of 200 yuan is their natural income. I think that since I have received their concessions, the district is worth about 200 yuan, so I honestly paid 1200 oceans, so I began to deepen deeper and deeper, began my long journey to decorate.


The Third Big Trap: The Budget Trap


Here comes the door-to-door surveying service. It is said that the company is a famous designer of the company. The teacher has a famous name, has many years of design and decoration experience, and is also the designer who originally received us. I feel that the designer is still very professional. , because at least a college degree, or school design, but you see the officer, the design of the future, but he specifically designed for us to trap another ah! ! !


I don't understand the decoration, so I totally believe that he will tailor our new home to suit us! ? Our decoration intention is just to simply decorate. In principle, we don't need to change the original design. There is no carpentry and other big projects. We just make some changes in the kitchen and the bathroom, knock out the original bathroom wall, and put it back. Move the wall outwards, remove a wall of the kitchen near the flue, and change a balcony into a sun room. After the various doors are knocked out, ask a professional door company to measure the door and install it. I also proposed With the need for circuits and waterways, he started measurements in various rooms and quickly completed the entire measurement task.


Since my home is a top-floor duplex structure with simple decoration and a tail building, we need to eradicate the tile and floor tiles of the original kitchen and bathroom and the wall ash of other rooms. We require only the use of wall and floor tiles and walls. Paint can be, there is no amount of work, I think this requirement as a so-called professional decoration company should be simple enough, there will be no difficulty, but my good wishes once again proved to be a beautiful bubble.


So I just waited for him to go back and give me design and drawing. In the meantime, I also saw many netizens commenting on this company. It seems that there is a lot of buzz, but I think it's not a big idea, such a big international chain. How will the company do such an embarrassing thing? I do not believe it when I die? !


I spent a week in unrest, and on the weekend we happily came to the company and communicated with the designers. Since we chose to design for free, there wasn’t any designer’s idea, and I was wronged to not use him. The creative talent, you know that if you want to unique design, you want to know many oceans? My principle has been set. Only this is the case. In a copy of the decoration drawings, we did not really understand the so-called renderings, ground maps, top maps, circuit diagrams, and construction drawings. But at the time, there was no more time to study. We had to simply put the drawings in separate places. Doing some explanations, I hope to make some changes, agree to confirm the next weekend, we pity our office workers, only two days of weekends in the district can be for their own small nest, had to sacrifice limited weekends to home and home market between.


It was hard to expect another weekend, so our entire family mobilized and ran to the home market. It was the hope of our new home! To the decoration center, once again see the revised drawings, anyway, I would like to have a professional designer checks, there will be no problem. We did not think much about signing the name on the drawings. We do not know that this is the root cause of all our future traps! It is really distressing. Why not consult other experienced friends and sign up in a hurry?


After signing the drawings, I entered the budget stage. I naively believed in the professional decoration company. Imagine that they have numerous decoration contracts signed every day. Are we all mentally or stupid like me? I think their budget may take a week to seriously ponder and produce, and they have a very large amount of business every day, not too fast! Once again, I was surprised to see my eye-catching. After all, it was a big company. It was worth noting the speed of a big company. On the third day, I called me and said that the budget was ready. You can confirm it! I am overjoyed, I finally saw the hope of a new house! My children always look forward to having their own room. I hope that before graduation, their classmates can celebrate their birthdays in their new room. I think I have hope, and I can satisfy my child's vanity!


But it was this budget that pushed me completely into a black hole that was not seen in the end. This is the third big trap I can't predict (budget trap). I regret it, why not keep my eyes open from the endless Find some questions in the numbers? Can anyone use my eyes to see this complex and cumbersome budget clearly and clearly? So in the eyes of the budget's eager expectations, I can only believe again that her budget is very professional and accurate, and meets our requirements.


I still seem to have a hunch, always feel that there will be such good things in the world? Because after I saw the budget, I was surprised that her budget was absolutely consistent with my expectations. Did she know what I was thinking, but I have never seen her before? Since our project is clean, this is also the company's usual practice, only the labor costs, management fees and taxes, I also earnestly calculated each item she calculated for us, but never noticed and I have nothing to do with the project (it can be this negligence, and later became their handle with the manager's complaint, because he said any text of the contract is useful, my budget lists all the list of charges, you do not see It is your question. As for the more projects, there are quotations, not arbitrary charges. This is a later statement.)


Therefore, people’s expectations will kill people. I think her budget is also within my expectations. I only think that some garbage cleaning fees are too high (RMB 1200). I hope that she will change because I feel that my family does not have a lot of bricklayer work. How much garbage can there be? What's more, I have already paid for the landfill clearance freight? So after the instructions, she removed a garbage cleared freight (double-storey building) (600 yuan), Okay, finally saw my home a 150 square meters of the complex structure of the house's renovation fee list: labor costs about 10,800 yuan, management fees 5,800 Yuan, taxes and fees 580 yuan, a total of 17,180 yuan, I have consulted a decoration company, it seems a lot higher than this, look at other people this big company does not slaughter, so happy! ? And if the total renovation price of more than 100,000 yuan, there are 6.8 fold labor costs, which can not save more than 3,000 yuan decoration costs? Did not tell you that the material fee for my report was about 94,000 yuan, plus the renovation fee in front of it was already over 100,000 yuan. I was so happy. Didn't this allow me to check out a big deal?


But I still stayed with one more eye and waited. Did this really good thing happen to me in the world? So I was busy working for half a month. I didn't care about them. I also surfed the Internet to see other people's quotes and related decoration posts, or the designer was not calm and said that your family's budget has been done, and it's very low. Why not sign a contract? Or can you just return your company to a thousand oceans? "A kind reminder, very timely, very place, everywhere for the sake of customers?" I can not help but gratitude, good comrades ah? But I also said that the Internet is all about your company. How do I believe? He eloquently said that the tree is a big move, because this company after crowding into a large number of small and medium-sized decoration companies in Beijing, can not sin? Naturally, there will be many people attacking, but I said that some are like decorators like me. Can anyone still be bought in the decoration diary? He is speechless. I was still attracted by the "budget trap". Is it really consonant? Hesitating...


The fourth largest trap: the contract trap


On the weekend, it looks like he needs to go to the decoration company and ask them how to explain it. I came to the decoration center with a restless mood. This time, the budget was a bit cold and I couldn't make a sound. I had to send another person to give it. We explained, but it seems that she did not understand anything. I was still a budgeter. I explained in a hoarse voice that if any increase or decrease occurred, it would count as it actually did, and I wouldn’t stop coughing. I really couldn’t make it. Understand, since the budget has already been made, there is also an increase or decrease? Is there a problem? She said that if some projects can be fine-tuned, it is precisely the phrase "project increase and decrease will be calculated according to actual circumstances," laying another heavy-weight time bomb for our bottomless black hole, which is also a bigger one. The fourth trap (contract pitfalls).


I am very sorry for this budget sister. She has a very serious cold. At the same time, I also admire her professionalism. She is still so sick that she is so heavy. Is it still difficult for me to bear her heart? Anyway, the contract is not big, not to mention the big material is decided by us. Where can we go to more than 10,000 yuan of renovation expenses? Do you not fine tune it? No big deal is 30 percent or up to 50. Is it okay? There is a discount of 68%. Isn't it much? Good people, you know, they had already counted you well, letting you have a happy signing of the contract, giving you the fourth biggest trap (the contract trap) that has long been prepared to kill you.


I signed this so-called official decoration contract without knowing it. It was said to be a nationally-recognized format contract, with the addition of a "project increase and decrease will be calculated according to actual circumstances" and a series of The terms of the advance payment, I did not look more, think about these are all form contracts, there is nothing to look good, but it is these terrible terms become later foreshadow and handle, I do not understand this is what they used to be Weapons? Who will protect our interests? When you are spectators, be careful and prudent to sign and write. This is the only umbrella that can protect you! But I still hastily completed the "unequal treaties"! ! ! !


The fifth largest trap: commissioning trap


I was still immersed in the joy of "Going out of the pie". I had to go to the existing house together with the foreman, the designer, and the supervisor. I couldn't wait to start work as soon as possible. So I took leave with the unit and proudly informed the comrades that I finally started. A "great decoration project", this is our family's expectations! On the afternoon of the 18th, it officially informed everyone to gather in a new room.


Because I had previously renovated it, there were many problems for the guerrillas on the road. Therefore, I was glad that I did not find the guerrillas on the road. In fact, we did not have time to spend on the construction site. We always thought that this time, such a large company would be left behind. Not? There were also friends who had searched for this company. We repeatedly asked us to select some more foremen. So I asked the designer to recommend a responsible person. My good thoughts were also responded, so I recommended one. It is said to be a very authentic Jiangsu "Foreman", "I was really grateful to this designer, met a good man!" ?


So everyone came to my cold house and a "massive project" was officially started. Everyone went into my room and immediately posted the company's advertisements on the front and rear windows. The door was also filled with advertisements. I think it was a big company and paid great attention to the images of advertisements and companies. Even these small problems were noticed, and I may have encountered them. "Regular forces."


But I also feel that there is something wrong with this. Among the group of decoration workers, there is not a formal dress code, but the dress code is the basic sign of “regular troops” but they are just like a group of ragged, ragtag people. After asking, the so-called foreman is a bag. The foreman, as for these workers, one of them is his father, one is his son, and one electrician (I have always suspected that he has strong and weak books), and another bricklayer (whether or not there is evidence to verify), Another is his wife, you talk about this is a good decoration team? Do international chain companies that I have always trusted have only one such decoration team? Are they the so-called "regular decoration troops"? I have an ominous premonition. Have I ever met a "guerrilla" who was wearing a legal coat and was worse than a "guerrilla guerrilla"?


After the designer and the electrician (started to say that he was the squad leader, he later went to work on another site after finishing his electric work), I was busy with other arrangements because I called stairs and heating at the same time. Measured with the manufacturers of the sun room, is communicating with them, and soon after the end of the living, I saw a so-called construction sign on the wall, but none of them were carefully measured positions, I think this is a design There is no problem if the teacher arranges according to the drawings, so even if the meeting is over, but I still don't know when my house started and how it started. Is there a basic construction program or schedule? I don't know at all. I'm really confused. Is this their bottom line?


Before I left, I went to the property company to pay a deposit, but when I asked that your family had already paid for it just before the time of arrival, I broke up with the foreman. However, the attention of the officials paid attention to the fact that another trap immediately appeared. When they were just preparing to shake hands, the “professional foreman” gave me a proxy for the procurement of materials. The original “fifth trap (trusted trap)” finally surfaced. Do you think that I can rest assured that this power of attorney will be given to them through the previous observations? I politely rejected his "good intentions." After all, "From our point of view let us run less?" But I was fortunate that he did not give him this power of attorney, or else the “settlement trap” would not be discovered later.


Sixth Big Trap: Purchase Traps


After the end of the handover, the supervisor also performed his assignments in a decent manner. I also said again and again whether it will start construction immediately. He replied that the foreman would set a specific start date and let me ask the foreman. Then the foreman said that it may start on the 20th (Thursday). As for what to do, he did not tell me what he was doing. I wonder why I didn't tell me how to buy materials?


After a short delay, we arrived at No. 22, and we still went to this home market and prepared to do pre-bargaining for outsourcing projects such as the sun room, stairs, heating and doors, but did not expect to encounter the foreman. Daughter-in-law, she also said that the foreman was looking for me and asked me to buy materials as soon as possible, otherwise I could not start work.


I rushed to find the foreman again. He said to expect, I said what to buy. He said that the electrician knew. So I immediately called an electrician who was working on my site. Hey guys, they showed me a series of In the list, I couldn't understand his Jiangsu dialect. I had to let the foreman listen to the phone. After five minutes of telephone recording, I finally got the first purchase order handwritten by phone. It was a good one page. How much money, I have not brought so much cash, how is it good? If you delay the schedule, but my responsibility!


In a hurry, I remembered that I had just started a credit card and could overdraft more than 20,000 yuan. Fortunately, the problem was solved. The foreman took us in the supermarket and used the cart to take the goods on his phone list. Poor we didn't know to buy so many goods. It seems that there is no such thing on the budget list. But I had no choice but to believe in them in order not to drag on deadlines.


Since large parts such as large core boards and gypsum boards are not in stock, they can only be delivered from the store. It does not matter anyway. The salesman will deliver the goods within 3 days. After being recognized and confirmed by the foreman, we will hold a long one. Delivery slips and shopping carts carrying a variety of telephone lines, wires, data cables and casings and accessories came together before the "Green Passage" cash register prepared for customers in the decoration center, left and right, etc. More than two hours ago, when I paid my money, there was a period of confusion. I wondered why the decoration center was in conflict with the cash register. (Note that the decoration center and cash register are not a single unit. What exactly is the relationship? So far it is still a mystery to me, but my decoration funds card has always been in the hands of people in the decoration center.) The decoration center took away all of the customer's decoration funds card. I have been waiting for it. No one explained to us what happened. We waited and waited until we had waited for a long time. The person in charge of a decoration center came back to return these decoration funds. We had the privilege of experiencing more than three hours of waiting. Finally paid for the money.


After paying the money, I have been pondering why the decoration center keeps the card in the hands of the customer and always controls it in his own hands. I know that I have input 20,000 yuan in this card, but before I paid for it, Cary has already deducted more than 10,000 yuan in pre-paid renovation labor costs and all management fees and taxes from the decoration center. I suddenly realized that. Only in this way can we easily control our money. As there is no password, as long as there is a card, the money in your card can be deducted. This made it easier for the captain to withdraw money from my account easily without my authorization.


I took a look at my shopping list, so scary. There are more than 500 meters of wire and 60 tubes of 3 meters. Is this dry? Do you want to "cloth spider web" in my home? Again is a sixth big trap (shopping traps) that I don't know how deep, where is the end?


In order to get to the scene as quickly as possible, we had to take a taxi to send the spot to the construction site. However, I was still confused as to what to do with these things. When I was poor, I still had to go to work. May our supervisor, he is going to see, is it according to my home contract? But did it not tell us whether we should and should not do it? Where is his supervision going?


The supervisor and the foreman are like the left and right arms of the decoration center. Who wants to cut his own arm? All are the supervisors and foremen of a company. What about supervisors? We seem to have fallen into this simple confusion again.


Seventh Trap: Project Traps


We always condemn others with a good heart. Since the project works for you, I can only believe you, but what happened afterwards cannot be predicted even if I have more imagination. After starting formal work on the 21st and ending on the 29th, the demolition of the previous stage and part of the hydropower reform project came to an end. I wanted to take time to look at the construction site, but who told us to work for the country and it would be too late to work overtime every day. Come time to see the site? So the long-looking foreman called me to go to the site for acceptance, saying that let me sign the confirmation of the pre-project? ! !


The original No. 30 was going to work, but considering taking a warm home for the future, we had to take leave! When I arrived at the scene, I was stunned by the spectacular sights ahead. The floor of the room and the rooms were full of starry plumbing pipes. It really fulfilled my confusion when I bought the line. It was like a spider web. On the ground, it is "magnificent!" Is this still my original home? I couldn't help but marvel at the craftsmanship of the electrician's "sweety of heaven". At this time, the foreman gave me a copy of the confirmation of change of works and let me sign it, and he said hurriedly that everyone had measured the amount of work. Sign up now? He said there are construction sites waiting for him to go to the cloud. I took the list and did not scare me out of heart disease. Well, in just nine days, there was a hand-crafted fee of nearly 6,200 yuan. We can look at this list:


The chiseled bricks are 23 meters per meter 16 yuan, 368 yuan,


Chiseling wall tiles 81 meters per meter 18 yuan, 1470 yuan,


Scoop top painting 110 meters per meter 8 yuan 886 yuan,


The shovel wall was painted at 230 meters per meter 6 yuan 1342 yuan.


Wall slot 59 meters per meter 12 yuan 716 yuan


Mixing slot 6 meters per meter 20 yuan 108 yuan


Through the wall hole 4 each 50 yuan 200 yuan


Line tube 180 meters per meter 3 yuan 540 yuan


Wire 550 meters per meter 0.4 yuan 220 yuan


Coincidence of 71 5 yuan each 355 yuan


Total about 6200 yuan.


Although I am not a professional, I cannot judge the level of professional prices. However, there is one of the simplest methods of calculation. It is these activities that are completed within nine days and they are completed by no more than three people. Therefore, it is also necessary to have statistics in the future. The estimated amount of work exceeds
10,000 yuan, which means that the daily wages is 10,000 yuan / 9 days = 111 yuan / day, good guys this is a high salary, I think the general white-collar workers seem to have a daily salary of up to 200-300 yuan, talk about a renovation worker? What kind of price is this? Is this seventh pitfall (project trap) too unfathomable? ! Have you ever seen such a deep trap when you are well-informed?


I cannot sign this word. So I asked the supervisor if he has approved it. He said that it has not yet been accounted for. Since the supervision has not yet been signed, I propose to take it back to seriously study the new item list and reply later.


The eighth largest trap: traps


The foreman had to hurry to leave. I wanted to ask what, but I didn’t have a chance. As a result, I could only helplessly make a fuss on the construction site. Imagined that maybe I would go to the head office to complain and I’d be able to do justice. I have lost my sanity at this time. I think normal people will have this reaction. Without my written or verbal approval, I would like to add more than one item to my hula. It is also spectacular and how can I accept it? The official project has not yet begun. My poor labor budget has been exhausted by these new projects. How much money will happen to me? I feel scared when I think about it! ! ! ! It is a "bottomless hole!"


Then, on the construction site, I told me that the pipes that should have been fed by me did not know when the project was completed by a professional pipeline company. And many hot water pipes are not necessary because I want to put a hot water treasure in my kitchen. Then why should I draw a long hot water pipe from the bathroom? How much money? Can I accept it? How to lay reasonable? This is another kind of eighth-largest trap (material traps). Why did all my misfortunes make me stand?


This is not finished yet. The so-called electricians said that the goods I had ordered last week were not delivered. They may have been lost by the distribution center. I was asked to buy the last ordered goods immediately. I asked various materials in detail this time. After use, I feel that they are playing again. Do you want to make insulation under the window sill under the balcony of my house? Okay, isn't the existing brick wall in my house not as warm as the glass on the glass? ! Is this necessary? There is also a wall to be plastered on both sides to prevent existing cracks from cracking in the future. If the structure is cracked, will the plasterboard be spared? I don't think it is possible?


After spreading the pipelines on the ground, at least one more layer of cement and mortar must be applied to the original concrete floor to begin paving. How much will this additional project cost? It is not known that I really feel that I have really fallen into an abyss. ?


Ninth Trap: Clearing Trap


I had to rush to the headquarters of the decoration center to find their responsible person to negotiate. When I learned that I was going to complain to the head office, the foreman was very nervous and immediately called me and said that there was a good negotiation and no need to go to the head office. How can I listen to his phone call and I don’t believe that the big international company is so unreasonable?


When I went to the decoration center, no one responsible person could receive me. I saw so many people are there. Why didn't anyone receive it? Finally, someone told me that the manager can come in the afternoon. I don't understand such a big company. There is no manager on duty. I had to talk about prices with other manufacturers in the market. Finally, I chose the stairs and the sun room. I signed the contract and bought the goods when I thought of the festival. However, I was forced to go to Carry. Money, in order to complete this contract, have been like this. I still believe that they will handle this matter fairly.


So in the afternoon, when I arrived at the Engineering Department, I was greeted by an assistant manager. I told him about what happened in my hometown. He could only say that he would give me an answer after the investigation. I think I can only do this, I hope You give me a formal written reply. However, I have been somewhat skeptical about the bill. Since the 23th had been issued to the cashier, why did the goods ordered have not been received after one week? With this question in mind, I checked all the consumption records on my funds card in the Finance Department. Would you like to see if the money originally planned to be delivered by the distribution center has been removed? When the bills were printed, it made me extremely scared. It turned out that on the second day of my order (that is, on the 24th), the money had already been withdrawn from my fund card. Did the distribution center lose the delivery note? What made me even more surprised was that there was a money that I had no idea of. The account was signed by the foreman. Is it that it is so easy for me to withdraw the money in my fund card? This is the case. What is the safety of my funds card? So I went to the cash register to ask them how they gave me a reply that made me even more stunned. As long as I had the signature of the foreman, I could freely draw money from the card. The so-called "material procurement request letter" was just used to restrict the construction team leader (poor). There was no such thing as a small team leader on the construction site of my house. I didn't know until the complaint was made. Because each of the foreman has more than a dozen sites in his hands, he must assign a dedicated team leader at each site to take charge of the specific issues of each site. Until I said that I was going to lodge a complaint, the foreman called to let his father take full responsibility for the work on my work site, that is, to take on the job of the captain. I was wondering: Did the captain be so casually appointed? His father had Is this ability and qualification?) The money in my fund card can be removed by the foreman at any time. This is Tiandu's ninth trap (settlement trap)? Imagine that if I were to complete this project, how could I know how much he had bought? How do you know where these materials are used? I feel scared. This is the most terrible thing. Money is controlled by the decoration center. How can I monitor it? ? ? ? ?


So I found an assistant manager again and wanted to see how he explained? He naturally said that these problems may only be asked by the foreman, so he called to ask the foreman why he had to buy these things without authorization. The foreman's answer is even more interesting. He said that he had contacted me by telephone. When did I authorize the telephone to agree? What's more, from his shopping receipt, I discovered that his shopping time was on the afternoon of the 27th. All the purchases were related to the transformation of the circuit. The circuit reconstruction of my home was already completed on the 26th, the electrician. Have already gone to other sites. Therefore, how could these things purchased by the Foreman No. 27 be used on my construction site from time to time? The explanation of the foreman was inconsistent and difficult to justify, and he agreed to bear the cost himself.


What is even more ridiculous is that in the afternoon, he suddenly received a call from the foreman and said that the orders he had not seen for a week had been delivered to the construction site. People accepted the inspection as soon as possible. Even the detailed list of delivery was not available. How can we accept it? I had to ask for return processing. Later, the chief of staff really returned the goods, but when I checked the funds card the next day, I discovered a new problem: the returned money was 700 fewer than the money that was originally allocated. Diversified, that is, there are more than 700 yuan of goods did not return, I do not know what kind of trickery here? I can't draw a conclusion, but what about a person with a little common sense? People shudder! ! ! !


Tenth Trap: Complaint Trap


Until the May 1st Labor Day, everyone else was playing around. I could only wait for their official reply. Finally, I hoped to come to the phone in the morning and say that the decoration budget can be re-instated. The money that the Chief Minister took is borne by the Decoration Center and then educated. Take a look at their construction team. This is their reply. Can I accept it? If you can not cancel the contract, but the labor costs of the project must be deducted, and the original 1,000 yuan will be transferred to the decoration project design deposit also deducted, this is how they deal with complaints? I feel once again trapped in another trap they had already set. I wonder if I can escape this tenth trap (complaint trap)?


I did not give up, I hurriedly took a taxi to the decoration center, or the assistant manager received us, but it seems that there was no result, I can only ask their manager to come and talk to us personally. Not a moment later, a manager came, but I have an impression on this person because I had met an excited complaint client as early as the day I sign the contract. At that time, it was his mediation and his words. I feel that this person is totally unsincere in resolving the issue. I just resort to delaying tactics and let the customer have to give up automatically, so that the construction period will be far indefinite. Can we stand such a toss? (The reason why they can do this is that as early as the signing of the contract, many of our funds have been deducted, so that you can not stop. And ordinary people can renovate a few times in life! Totally inexperienced ordinary people It's not possible to have enough time to fight with their professional decoration company! Even if you fight, because he has already laid down many traps for you in the previous session, the chance of winning is also very small.)


But I told him what I had met in 1510. First of all, the accuracy of the budget not only did not have any reference significance, but also caused people to stumble into the trap; followed by the settlement of the funds card, we had no control, only With the signature of the foreman, money can be transferred; there is a construction team and a group of grassroots teams who are worse than the militia guerrillas. How to ensure the quality of the project. After carefully reviewing the electricity pipes scattered across my home, I discovered that they had done so without permission. Many of the changes are completely unnecessary, because they have to earn more labor costs, and many of the changes in the wiring are nearing the goal;) How does the supervision work, are they unknown to these projects? The promised free delivery within three days, disappeared one week after the customer's money was transferred, how can one feel at ease? Why did the renovation of the water pipes without prior confirmation by us led to the completion of the project without authorization? If you cancel the contract now, how can we compensate us for the loss?


If, as I expected, the manager did not have any substantive reply to our questioning, it was also a delaying tactic. He said that after the investigation and report, he gave me the result. When is it an end? I suffered this series of spiritual losses and material losses during this May 1 Golden Week. Who can give me compensation?


As a civilian, how can we confront such a professional decoration company known as an international big brand? And the contract traps only protect their rights, and our rights are not guaranteed.


I went back to my broken home and had the time to seriously appreciate their "masterpieces." This look even more made me cry, my God, I had a good circuit system and telephone, data The system, after their handling, has changed beyond recognition. In order to construct the drawings, there was a slot in a few centimeters, but they still gave me a new slot. Do I have head water? Why do you not need to be slotted? All of them are downright repetitive transformations, making the ground like a spider web, and how will the hidden dangers in the future be solved? How much does it cost to get behind the unnecessary mortar cement leveling? How many unnecessary leveling projects do my walls have? What is this electrician?还有许多电接头的隐患,我该找谁去讲理?希望大家给我一个建议,我该如何处理这堆烂摊子?伸出你们的援助之手,帮帮我吧! ! ! ! !

玄关装修儿童房装修装修设计房间家居装修家居新房新房装修预算清单装修找装修公司好吗复式房子装修效果图复式装修效果图新房装修预算大厅装修效果图阳光房装修效果图厨房装修图楼梯装修效果图家居装修效果图玻璃砖玻璃门厨房墙砖厨房玻璃推拉门卫生间设计卫生间墙砖卫生间瓷砖卫生间地砖卫生间门家装家居家居布置瓷砖价格厨房瓷砖阳台瓷砖装修家居

Up And Over Garage Door Lock Case


Handle square 8mm

Unlocking lever

Bolt with 6mm hole is optional

Lock case used for EURO PROFILE HALF CYLINDER

Interchangeable: With most common roller shutter locks available on the market. The reinforced bolt  makes the roller shutter more resistant to attack

.Reinforced steel bolt: 2mm steel plated folded back on itself to reach overall 6.5mm thickness

Bolt available with 6mm hole/ M6/ M8 hole

Rustproof zinc plated box and components


Up And Over Garage Door Lock Case

Up And Over Garage Door Lock Case,Sliding Door Lock,Garage Door Latch Lock,Automatic Garage Door Lock

Rayma(SJZ) International Trading Co., Ltd. , http://www.raymalock.com