It is well known that toilets are the most frequently used areas in the home. If the toilets are not waterproof enough, they will bring a lot of trouble to daily life. Many homeowners are first renovated and they do not understand the waterproof construction process. So how does the bathroom waterproof? What is the construction process of the bathroom waterproof? The following article will share these issues and everyone to share, looking forward to help the needy friends.
How to do toilet waterproof - handle well done waterproof position base
When people are doing toilet waterproofing, they must master the correct methods and procedures so as to ensure the construction results. First of all, we should first deal with the base surface, if the base surface has voids, cracks, inequality defects, must be repaired and leveled with cement mortar in advance, expansion joints suggest sticking plastic strips, nodes must be added a layer of non-woven fabric, nozzle It is recommended to use Leibang Shi plugging king or nozzle grouting material. In addition, the corners of the wall should be rounded (or V-shaped) and ensure that the base surface is sufficiently wet, but there is no clear water.
How to make bathroom waterproof - base waterproof construction
After everyone has handled the base surface, the waterproofing of the base surface can be carried out. The specific construction steps are:
1. Use a brush or roller brush to brush directly on the base surface, use evenly, and do not miss the brush; generally need to brush 2 times (according to the use requirements), each brushing thickness does not exceed 1mm;
2, after a little dry before the first time after brushing (just sticky hands, usually interval 1-2 hours), vertical and horizontal cross-brush before and after, brushing the total thickness of 1-2mm;
3. If the coating has cured, apply it with water when brushing another layer. Special attention should be paid to the corner of the wall to be processed into a circular arc and then painted, and the brush should not be too thick (the total thickness does not exceed 2mm);
4, wear pipe should be sleeved sleeve, casing and wall holes to plug the king with a good plugging, and brushing waterproof material to the bushing 10cm high and can not be too thick.
How to Make Toilet Waterproof - Waterproof Construction of Facade
In order to prevent water from seeping into other spaces in the home, you also need to apply a waterproof coating on the wall of the restroom. Everyone should pay attention to the position and height of the waterproof brush when constructing: Generally, the wall is painted with a brush height of 30cm; the wall around the shower area is painted with a brush height of 180cm or up to the top of the wall; The brush is 30cm higher than the bathtub.
How to make bathroom waterproof - test water test
After everyone has done a good job of waterproofing the restrooms, they also need to test the water to test their effectiveness. The specific test method for the water test is: After waterproof coating is applied to form a waterproof layer (after about 24 hours), water is 20cm high. After 24 to 48 hours, see if the water is significantly reduced or go downstairs to see if there is a roof. The wet water point, if not, means that the waterproof construction is qualified.
The above is related to how to do toilet toilet waterproof construction process and explain the relevant sharing, to give you a reference! Toilet waterproof construction is a technical activity, we are best to hire experienced master to construction, in order to ensure the construction effect. If you have more related issues, welcome to continue to pay attention to this site, and later will bring more exciting content for everyone.