Many people think that the rainy season is very inappropriate for decoration and there is no benefit. In fact, this idea is more one-sided, as long as we take care of the decoration of the rainy season, familiar with the nature of various building materials, but also can do a good job in the rainy season decoration.
Li Kemai Lighting   Jumei Indian Home Furnishing Museum Â
Paint construction
The paint should be kept away from the rainy days. For wood products, whether it is a varnish or a nitrocellulose paint when mixing oil, do not do it on rainy days. Because the surface of wood products will gather a layer of water vapor in the rainy day, if paint is applied, water vapor will be trapped in the paint film, making the surface of wood products cloudy and unclear. For example, nitrocellulose lacquer on rainy days will lead to uneven color, while brushing will cause whitening. If it is necessary to meet the deadline, a certain amount of white powder may be added to the paint. White powder can absorb the moisture in the air and accelerate the drying speed, but it will also have a negative impact on the quality of the project. So under normal circumstances, even if the construction team has to do something else or stop working for two days, it should not paint as much as possible on rainy days.
Special reminder: Although the effect of rain on the wall paint latex paint is not too big, but also pay attention to extend the time after the first pass after the wall dry. In general, the normal interval is about 2 hours, and the rainy days can be extended according to the weather conditions. Scraper putty can be used as early as some processes need to have a dry process, such as the wall putty scraper above the wall, each pass through a period of drying, each time dry and then can be scraped again, it is more difficult to dry in the rainy season. After a putty has been scraped, it is not uncommon for a week to be dry. Therefore, during construction, this process should not be carried out when the project is nearing the end of the project. It is better to arrange it early so that the interval can be longer to allow it to dry. If you are unlucky enough to encounter continuous rain, the air is too humid and the wall is not easy to dry, you can use the sun light to illuminate the wall surface, so as to promote its drying as soon as possible, to avoid problems such as yellowing, bubbling in the future. Special reminder: Putty putty usually takes 1-3 times, during which the normal dry time is 1-2 days. When puttying is done on rainy days, use a dry cloth to wipe off the wall vapour to keep the wall dry as much as possible.
Wood products
The moisture content of wood products should be lower. When selecting wood products such as blockboards and plywood, the quality of the wood products must be selected first. In addition, it is best to choose the “fresh†products that have recently been produced on dates since most wood products are in the workshop. Basically it has been dried. Plates with earlier production dates will absorb a certain amount of moisture during the rainy season, which will make the material moist and affect the decoration. In contrast, when choosing a wooden keel, it is best to choose a production date that is relatively early and has not been stored in the open air. This kind of keel will have lower moisture content than just processed.
Buy solid wood flooring should choose brand products. The small-scale processing factory is baking the wooden floor according to the traditional process, which has a higher rebound rate of water absorption, and the brand products are baked according to the modern molecular oscillation technology, so the chance of water absorption deformation is very small. Special reminder: In the process of transportation, it is necessary to prevent the decoration materials from being exposed to rain or moisture. Considering that there is much moisture in the rainy season, some wood products and plaster lines should be left in place when leaving the seams.
Line arrangement
When short-circuit and wet-weather wires are to be prevented from rainy weather decoration, attention should be paid to the standardized operation of the circuit transformation, especially in the places where the balconies are easily wetted by rain, and the copper wires that are exposed outside the wires must be wrapped. To prevent short circuit after the cable is wet. This should be taken into account when it comes to wires that surround wood products such as damp wood keels and large core boards. If you do not care about these parts, it is likely to cause a fire. If it is rainy, you can adjust the process. For example, the waterway renovation in the pre-renovation period is an indoor project, so it is not affected by rain. Special reminder: In thunderstorm days, the circuit renovation in home renovation must be stopped, otherwise it is very dangerous.
Precautions Three trees paint entrance decoration paint interior decoration home decoration home latex paint decoration home
A Workstation sink is a sink with a mechanism built in to the front and back sides of the bowl to allow accessories to sit on the step or ledge, affording the user to prepare meals on the sink instead of on the countertop. The intent behind the design is to speed up the process of food preparation and clean-up.
Workstation Sink,Farmhouse Workstation Sink,Work Station Kitchen Sink,Workstation Farmhouse Sink
JIANGMEN MEIAO KITCHEN AND BATH CO.,LTD , https://www.jmmeiaogroups.com