Water and electricity acceptance is an important part of the home improvement process. Because the hydropower project is a concealed project in fitting-out, life cannot be separated from hydropower. Therefore, acceptance of hydropower is very important. Therefore, only by mastering certain skills and methods can we do a good job in hydropower acceptance. The following Xiaobian introduced how to check and approve new houses and hydropower .
How to Accept New House Hydropower
1. Hydropower acceptance steps and tools
Acceptance tools are prepared by the construction party and include: flow wrenches, raw material belts, plugs, jacks, water tanks, connecting hoses, etc. The owner can bring tape measures, small notebooks, small torches, etc. to facilitate on-site measurement and recording of various data. The wiring inspection must see whether the clear water circuit wiring conforms to the specifications, including the distance, position, orientation and distribution of the water pipes. When pressure is applied, water pressure test must be performed. For other details of the inspection, such as the drainage pipe condition, the drainage slope, the position of the wire box.
2, hydropower material inspection must be careful
Check the quality of wire and water pipe materials. First of all, check whether the brand of the water pipe is the same as the list of decoration materials. The hot and cold water pipes must be clearly defined and the cold water pipes must not be used as hot water pipes. See if the brand and list of wire materials are the same.
3, water and electricity pipeline layout inspection
The layout of pipelines should be “horizontal and verticalâ€. Regardless of the trend, the direction of general water pipes and the balance of wall edges should be 90 degrees between the water pipes. There must be no joints or kinks in the wire line tube, and the wire should remain arcuate at the bend.
4, water pressure test and circuit test
When the waterway is inspected, it is required to conduct a full-close test and pressure test on the water pipe. The pressure strength is generally 0.6 MPa and the seal is closed for 24 hours. Check whether there is any water leakage in the pipeline. You can use newspapers to lay on the water pipe joints. After a period of time, check whether the newspaper has traces of water caused by leakage. For circuit acceptance, it can be checked whether the wiring of the electrical box is reasonable, whether the circuit's main switch is separated and clear, and whether the leakage switch is flexible.
Editor's summary: The introduction of new houses and hydropower is introduced here. I hope to be helpful to everyone, and I would like to know more about this website.
How to check the water and electricity