Most of the houses purchased by many people are rough houses. Many of them are decorated by laymen and do not understand the order of decoration. What is the order of the renovation of the rough house ? Today, we will take a look at the order of the decoration of the rough house through the following related contents.
The order of the rough house renovation - pre-work
Before conducting the renovation of the rough house, we need to first determine the relevant design plan and the budget situation with the decoration company. After confirmation, the decoration contract can be signed. In addition, the owner is also best to measure the housing construction area again, the size of the construction of each project, so that in the construction process, timely communication with the designer rectification projects.
The order of the rough house renovation - the main transformation
After the current period of work is ready, it can formally enter the construction process. First of all, it is the subject's demolition and reform project. You can understand it literally and rectify the main frame of the house, such as demolishing the wall. Designing the house frame first will help the decoration, but after the construction is completed, it needs to be cleaned.
The order of the rough house renovation - hydropower construction
The hydropower construction project is the highlight of home improvement. Once the tile is finished and the ceiling is installed, if it is found that there is no construction, it will be very troublesome and time consuming to rework. Therefore, during the construction process, it is necessary to keep the line at a certain distance and the wiring should be horizontal and vertical. In addition, it is also necessary to determine the approximate location of various types of electrical appliances and switch sockets so that reasonable construction can be carried out. At the same time, hydropower materials should be selected with high quality products and have a longer service life.
The order of rough house renovation - basic projects
When the hydropower is reformed, it is necessary to carry out the construction of the basic project, which mainly includes the mud and wood stage and the paint stage. Which project is dirty and which is the first to construct, muddy water is the first process, which includes the construction of tiles and floor drains, then the woodwork enters the field, and finally the paint construction project. When carrying out paint construction, it is necessary to protect the finished product on the ground and reduce the amount of paint dripping on the already constructed ground.
Blank House Renovation Sequence - Installation Project
When the paint is applied well and dried naturally, the installation of the later building materials can be carried out. This side contains a lot of items, such as cabinets, floors, small switch sockets, lamps, etc., which are installed in this link, in the installation process need to pay attention to the order and steps to avoid poor installation.
With regard to the order of the renovation of the rough house , Xiao Bian introduced it here for the time being, hoping to help you. If you want to learn more about the decoration, you can pay attention to this site information, more exciting content waiting for you.
Rough house renovation order