Concrete pump installation and commissioning

1, installation If the concrete mixing truck feed concrete pump (pump), can be installed locally, as long as it can easily take over and feeding can, if it is on-site mixing concrete supply, first of all should be based on the venue and mixer The feeding method to determine the mixer position, and then according to the mixer discharge height and suitable for pumping and takeover requirements to determine the location of the pump. The installation method is as follows: (1) The pump is first placed on a firm cement floor or stone pier to maintain its level, and the pump 4 legs positioning pin and safety pin locking, the tire off the ground or unloading Tire off. (2) A chute is made between the discharge port of the mixer and the pump hopper, so that the material discharged by the mixer enters the hopper of the pump through the chute. The chute is usually made of angle steel, welded by 1.5mm thick steel plate. Stand below the chute to make it firm. On the chute, the required slope is appropriate, the best angle of inclination of 25 degrees -40 degrees, there must be some space between the chute and pump hopper, easy to clean the hopper and sieve. (3) Under normal circumstances, the hopper above the pump to be raised above about 20cm, so you can increase the hopper volume to ensure that the concrete is not outflow (due to a forced mixer best unloading finished material, so into the hopper concrete More uniform, such as sub-discharge, the last out of the concrete stones too much, on the pump negative, if you are using a large capacity blender, you can make a storage hopper in advance to ensure continuous feeding.) (4) Pump After installation in place, to ensure that the pump casing door can open, close freely, easy maintenance operation. 2, pipe layout (1) pipe layout should ensure smooth pumping and normal delivery under the premise of minimizing its length, and reduce the elbow to reduce the transmission resistance. (2) It is better to connect the straight pipe above 2m in front of the conical pipe and then use the elbows, and also ensure that the straight pipe axis coincides with the conic pipe axis and be fixed and reliable so that the conical pipe can be quickly installed after disassembly and cleaning Back (3) Each pipe shall be firmly connected. A fixed fixing device shall be provided at the bend pipe. A tight point shall be set every 10m for the horizontal pipelines. The pipe clamps shall be left floating for easy disassembly and connection. The clamps must be fastened in place to ensure tight seal joints, no leakage, leakage. (4) According to the on-site construction conditions and take over the takeover requirements, reasonable layout of the pipeline to eliminate hidden dangers. 3, commissioning (1) pump installed in place, the pump should be the first overall inspection, inspection includes: the level of the fuel tank is within the specified range, hydraulic hose fittings, pipe clamps and other connections seat holder is Loose, with or without oil leakage, the electrical components of the connection is disconnected or off-line, the contact screw is loose, the hopper whether there are foreign matter or impurities. (2) electrical inspection. First of all, check if the on-site voltage is (380 ± 10%) V, and set a special control switch for the pump. The specifications of the used cables should be the same as the main cables on the pump, and ground the cables as required. Then do the following checks: A, close the control line switch, the power indicator light, PLC PLC module is energized, then observe the module indicator (respectively, start, run and fault), if you start, Running lights; and fault light off, then normal, you can carry out normal operation, on the contrary is not normal, the pump can not operate. B, press the motor start button to see whether the motor AC contactor action according to the program, the motor indicator light is on. C, respectively, by pumping, anti-pump, pressure test, stirring button to see whether the programmable logic controller input and output signals. $$ Div $$ (3) If everything is normal, the pump will start running. A, the main motor and control circuit of the air switch to "close" position. Open the key or emergency stop switch, such as power indicator light, indicating that the control circuit power has been connected. B, jog motor start button, so that the main motor running 1-2S, and check the main motor steering, (from the motor output shaft should be counterclockwise, that is, with the main pump marked rotation consistent); if the steering is wrong, As long as any exchange of two-phase power supply can be. C, the machine empty run 10min, check the machine for any abnormal noise, whether the pipe clamp loose or oil spills, board valve pressure reaches the required value. D, open the water tank cover, filled with water to the tank or at least flooded piston rod, water movement will make the shaft seal and concrete piston quickly damaged. E, check whether there is lubricating oil pump, and lubricants as required. F, with a grease gun, respectively, to the distribution valve cylinder and the tank in the middle of the oil rod full of oil. G, pressure test operation 10S, to close the oil circuit and check the main system pressure. H, press the pump button to observe the pump action is normal, start stirring, check its positive and reverse whether the direction of the switch marked (from the motor output shaft, clockwise to positive). I, pumping 10min after the anti-pump operation, and check the positive and negative pump switch with the same direction. Throughout the operation, we should always pay attention to the connection of the various parts of the pump, high-pressure hose and the various instruments, in case of emergency directly stop by the total stop switch, just in case. (4) Concrete. Complete machine no-load debugging can be prepared after the pumping of concrete, but also before pumping to do: Understand the variety and quality of coarse aggregate in concrete and particle size and grading, and the formation of a strict labor organization, a reasonable division of labor , Arrange the contact measures, by hand responsible for monitoring the feeding situation, and ready for a variety of maintenance tools and conveying piping cleaning appliances, ready for night lighting. As the maximum particle size of the coarse aggregate is limited by the minimum working diameter of the pipeline, it is required that the maximum size of the gravel does not exceed 1/4 of the pipe diameter and the pebble does not exceed 1/3 of the pipe diameter. A small amount of the oversized aggregate Mixed, but not more than 2%, and they must be dispersed, the type of fine aggregate, sand users to make the best pumpability, the average particle size of 0.25-0.3mm, the general sand 38% -45% , For coarse sand, sand requirements in more than 45%, fine sand is better in the 31% -33%, water-cement ratio of pumping concrete to 0.4-0.6 between the general situation with admixture superplasticizer, it Can make the coagulation structure of the slurry into a dispersive structure, thereby improving the fluidity. Concrete slump is generally controlled at 8-23cm, for long-distance and high-altitude pumping generally controlled at 18-20cm, pumping down and greater drop, usually controlled at 12-14cm. (5) When pumping concrete, pay attention to the following points: A. Start the concrete pump to run airlessly. If the air temperature is low, the idle time should be longer. The temperature of hydraulic oil should be raised to 15 degrees Celsius to pump. B, add a certain amount of water to the hopper to warm the hopper, valve and distribution pipeline. C, Before pumping concrete, the mortar should be pumped 0.5-1m3; part of the mortar must be retained in the hopper (to the axis of the hopper, the next place), until the concrete to join the hopper after pumping together. D, in the process of pumping concrete, pay strict attention to the actual mixing quality of concrete and slump, if the mixing out of the concrete does not meet the pumping requirements, must be removed. E, the hopper should not be filled with concrete online, the network of ultra-fine aggregate and debris to be promptly removed, when the hopper mixing shaft is stuck stuck, to pause the pump, and timely reversal of operation, excluding Failure, the hopper in the concrete can not be too small, in order to prevent pipe blockage caused by suction, when the supply can not keep up, to stop pumping in time. F, the pumping operation to be interrupted for a long time, should stop mixing within the hopper, otherwise it will make the concrete sinking coarse aggregate, once again pumping, should be stirred, to be positive and anti-pump operation for two After the stroke can resume normal pumping. G, in the pumping process, we should always observe the pump on the various instruments of pressure and lubrication, etc., if abnormal, should be promptly removed to ensure the normal pump. 4, pipeline cleaning Before cleaning the pipeline, it is best to pump 0.5-1m3 of mortar, and after all the pump down and then stop, and then pull the plate valve switch, remove the accumulator pressure. There are two ways of pipe cleaning, namely washing and air washing, whether it is washing or air washing, the valve box and the hopper should be cleaned. When washing, you should open the conical tube and clean it, and then will be immersed in water soaked into a cylindrical cement bag and cleaning the ball will have been cleaned into the conical tube, and then back to the cone and pipe, closed Unloading the bucket door, then filled with water to the hopper (to keep the water constantly); pump water until the cleaning ball pops up from the front of the delivery pipe. Washing, requiring cutting ring and the eye plate (butterfly valve pump is a plate valve and tie rod and up and down wear-resistant film) to the gap is small, there must be a lot of water, sealed, so clean the ball after the water does not penetrate . At the end of the washing soon, pay attention to the water in the pipeline, do not flow to the pouring point of concrete, by the impact of free concrete quality. This method is simple, less dangerous, more commonly used. Air wash, that is, with compressed air purge, it is soaked in water cleaning ball first plug into the air wash, and then connected with the reduction of the first straight pipe, and the end of the pipe connected to the safety cover, (The hole in the safety cap must face downwards). Air wash, to control the pressure of compressed air does not exceed 0.8MPa; valve to be slowly opened when the concrete can flow out smoothly before opening the atmosphere valve; gas wash is completed, immediately close the valve. Air washing need to be equipped with air compressors, to be strictly in accordance with the provisions of the operation requirements of pipeline sealing, but the air wash can not wash a long pipeline, the long-distance pipeline should be segmented cleaning, this method of operation to be cautious, More dangerous, so construction workers should be away from the exit direction to prevent the ball or cleaning the ball flew wounding.

Hitachi Escalator Spare Parts

Hitachi Launches New TX Series Escalator for

India, Asia and the Middle East

Hitachi Escalator Parts

Tokyo, August 21, 2017 --- Hitachi, Ltd. (TSE: 6501, [Hitachi") and Hitachi Building Systems Co., Ltd. today announced the launch of the new TX Series escalator for India, Asia and the Middle East. The escalator has already been released in China*1, and will be released in stages across the remainder regions, commencing August 21, 2017.

In July 2016, Hitachi integrated its escalator businesses of Japan and China, consolidating its resources and enhancing its business operations in both countries, centered around its key business location in Guangzhou, China. The new TX Series escalator launched by Hitachi is a model that meets multiple standards in China, India, Asia and the Middle East. The model follows the same concept for the machine room-less elevator for Asia and the Middle East which was launched in September 2016. In addition to conforming to Chinese safety and quality standards for escalator equipment, the TX Series will be manufactured in accordance with Hitachi's own strict standards of safety and quality, adhering to safety standards in all other regions. It also adopts a functional design based on the concept of an escalator that fits closely with the unconscious actions of users, in the pursuit of their ease and comfort.

The TX Series offers flexibility with a selection of various product specifications, as well as its excellent design and safety features, designed to cater to a diverse range of customer needs. It also saves space required for the installation, covering a smaller area in comparison with existing products*2.

Hitachi will begin sales of the TX Series in Thailand, followed by launches in the Philippines, Malaysia and various other regions, and aims to receive orders of 10,000 units in 2018 in China, India, Asia and the Middle East.

Features of the TX Series

  1. Safety
    The TX Series offers various new safety features designed with optimal user safety in mind. The side portions of the steps are 8 mm higher than the central portion to prevent accidents in which a users' shoe can become caught between the step and the skirt (side wall) of the escalator. The new TX series has also been fitted with brushes located at foot level on the left and right skirts to let users know if their foot comes into contact with the side walls. A special finish has also been adopted for the landing plates at the entry and exit points of the escalator to prevent users from slipping when getting on and off the escalator.
  2. Design
    The TX Series adopts a simple and functional design that offers the smoothness, safety and comfort that users unconsciously expect to experience when riding an escalator. For example, by minimizing the size of the metal frame supporting the escalator's balustrades, the TX Series' design maximizes the size of the glass surfaces, and achieves greater simplicity at the entrance and exit points (landings) by reducing the number of recesses and protrusions around the hand rail. Additionally, by expanding the installation space of the light fixture, the TX Series also enables enhanced lighting options for illuminating the entire surroundings of the balustrades.
  3. Space saving
    By shortening the span dimensions*3 by 150 mm, the TX Series has made it possible to install escalators in more confined spaces where installation presents difficulties with conventional product designs.
*1 In China, Hitachi started selling the TX Series escalator in June, 2017.

*2 The made-in-China escalator, [SX series," which is previous model of [TX series."

*3 The span between the beam on upper floor and that on the lower floor of the escalator when the escalator is installed.

Hitachi Escalator Spare Parts,Hitachi Escalator Parts,Hitachi Driven Wheel,Hitachi Step Rollers

CEP Elevator Products ( China ) Co., Ltd. , https://www.zjsmartcommercialescalators.com